List Your Equipment For Free  /  Seller Login

Contractors Digging Deep for Ventilation Shaft Construction

Tue June 27, 2023 - West Edition #14
Associated Press


Photo courtesy of the U.S. Dept. Of Energy

CARLSBAD, N.M. (AP) The U.S. Department of Energy says it's making progress on a new ventilation shaft at the nation's only underground nuclear repository that will allow the facility to ramp up operations as it disposes of tons of waste from decades of research and bomb making.

Contractors have dug more than a third of a mile into the New Mexico desert to build the shaft and are approximately 250 ft. from reaching the final depth.

Ventilation at the Waste Isolation Pilot Plant has been an issue since 2014, when a radiation release contaminated parts of the underground facility and forced an expensive, nearly three-year closure. It also delayed the federal government's multibillion-dollar cleanup program and prompted policy changes at national laboratories and defense-related sites across the U.S.

Carved out of an ancient salt formation approximately half a mile (800 m) deep, the subterranean landfill located outside of Carlsbad received its first shipment of radioactive waste in 1999. The idea is that the shifting salt will eventually entomb the waste.

Officials said approximately 13,000 yds. (11,887 m) of concrete were used to line part of the new utility shaft, while the remainder will be lined with steel mesh and bolts to keep the salt walls in place.

The work involves geological mapping, drilling and blasting before all the material is excavated to make way for the shaft.

Officials said the whole ventilation system is expected to be done by mid-2025 and will triple the air flow.

Environmental groups and nuclear watchdog groups have voiced concerns that the ventilation project could lead to further expansions of the repository.




Today's top stories

Florida's Sarasota Bradenton International Airport Sees $105M Terminal Expansion

Louisville Pump Station Receives $230M Update

Rokbak Haul Track Telematics Boost Uptime With Proactive Maintenance

SISO Air, InTerra Form Strategic Reseller Agreement

Hitachi Construction Machinery Wins Silver in 2024 Anthem Award

Balfour Beatty's Carolinas Operations Selected for Over $36M in Special Project Works

Caterpillar to Spotlight 'Next 100 Years' at CES 2025

Liebherr to Exhibit at World of Concrete 2025


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA