List Your Equipment For Free  /  Seller Login

Cutter Tooling System Designed for Easy Replacement of Bits, Inserts

The Roadtec QX1 quick change cutter tooling system is designed for better access to the wear parts located on the cutter drums of Roadtec milling machines and stabilizer-reclaimer machines.

Wed April 13, 2016 - National Edition
Construction Equipment Guide


The Roadtec QX1 quick change cutter tooling system is designed for better access to the wear parts located on the cutter drums of Roadtec milling machines and stabilizer-reclaimer machines.
The Roadtec QX1 quick change cutter tooling system is designed for better access to the wear parts located on the cutter drums of Roadtec milling machines and stabilizer-reclaimer machines.

The Roadtec QX1 quick change cutter tooling system is designed for better access to the wear parts located on the cutter drums of Roadtec milling machines and stabilizer-reclaimer machines. The QX1 system is designed to provide increased access for bit and insert replacement.

The base block and sleeve design provides the ability to remove bits and tooth holders using rear punch tools, or wedge tools and bit forks. Notches in the seating face of the QX1 sleeves allow the use of a small wedge tool for removal. Notches in the nose of the sleeve allow the use of a fork tool for cutter bit removal. A shortened shank at the sleeve also makes tool removal with a rear punch tool. The QX1 base blocks are designed to provide easier access to the end rings at each side of the cutter drum.

The QX1 quick change cutter tooling system is intended to reduce the routine maintenance time required to change the tooling components. It is available for installation on all Roadtec cold planer drums and stabilizer-reclaimer drums, with 6mm line spacing or greater.


Today's top stories

Construction Market Boosts Economy

Bobcat Company Donates $885,000 in Equipment to Support Salvation Army's Disaster Relief Efforts

VIDEO: KEMROC Expands; Plans to Increase Nationwide Presence

'Machinery Pete' Interviews Jack Lyon On RFD TV

VIDEO: Two Major Roadway Project Contracts Awarded by State Officials in West Virginia

VIDEO: First of Two Sections of NYC's $1.45B East Side Coastal Resiliency Project Is Complete

John Deere Construction Introduces Flexible Customer Training Options

INFRA Grant Moves Ohio's N. Coast Connector Project Steps Closer


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA