List Your Equipment For Free  /  Seller Login

E-Z Drill Features Model 210B-2 On-Grade Concrete Drills

The company will be at booth 61330 at ConExpo to showcase their new products.

Wed December 04, 2013 - National Edition
Construction Equipment Guide


E-Z Drill’s model 210B-2 on-grade drills will be highlighted at booth 61330 at ConExpo-Con/AGG 2014. Part of the 210B Series of on-grade concrete drills, the model 210B-2 joins the model 210B as an easy-to-position unit that drills to a standard 18-in. (45.7 cm) depth. Both drills feature a compact frame, allowing each to operate within a 4-ft. (1.2 m) area. The units have been specifically designed for straight-line drilling on a level subgrade, and are ideal for airport work, lane additions and large patchwork jobs, according to the manufacturer.

Offering third-generation quality, the enhanced single-gang Model 210B can operate within 6 in. (15 cm) of a corner and drill a 3/4-in. (1.9 cm) hole 9 in. (22.8 cm) deep in about 15 seconds. The Model 210B-2 also drills within 6 in. of a corner and provides an inexpensive option for a two-gang system. Both units are totally pneumatic, with the 210B requiring 100 cfm and the 210B-2 requiring 200 cfm. An optional vertical conversion kit enhances the series’ versatility, allowing each unit to switch from a horizontal drill to a vertical drill within 20 minutes.

As with the complete line of E-Z Drill products, the on-grade drills offer numerous features to increase production and help prevent downtime. Quick-release bit guides correspond with any style of bit for a fast, simple exchange, while vertical height adjustment levels enable each unit to drill on center whether the slab is 6 or 24 in. (15 or 61 cm) thick. E-Z Drill’s roller bearing feed system eliminates friction while drilling, increasing speed and productivity. Drill carriages easily can be replaced, as needed, with basic tools, and quick coupler air fittings further simplify maintenance. Regulators on the 210B-2 allow the operator to set the optimum drilling speed for each individual drill. Dual-purpose guide wheels on the 210B help with positioning the drill during operation and can be quickly flipped down and used for transporting the unit.

Both on-grade models feature components to protect the machine, as well as the operator. Carriage locks secure the drill and bit in place when the air supply is off or disconnected, and auto-lock couplers automatically secure the air supply hose onto the drill coupling so that the connection does not need to be manually pinned. Individual oilers help the drill motor last longer by lubricating each drill from separate reservoirs. A balanced lifting point increases safety during loading and unloading by helping to prevent a load shift, and lifting handles provide proper leverage to lessen any injury risk while increasing productivity.

On-grade models operate on the subgrade, allowing work to continue without obstructing the traffic lane. Another advantage offered by on-grade units is that they are lighter to load and unload than slab-rider models. In addition to the Model 210B and Model 210B-2, the E-Z Drill on-grade line includes the smaller Model 65B, Model 85B and Model 110B.

Established in 1987 after creating a solution to slow, handheld rock drills, E-Z Drill now manufactures lines of slab rider drills, on-grade models and equipment-mounted drills, as well as vertical utility models and concrete drilling accessories, such as dust-collection systems and cure trailer sprayers. E-Z Drill also can custom design and build automatic drill systems for customers’ specific jobs.

For more information, call 800/272-0121 or visit www.ezdrill.com.




Today's top stories

Construction Market Boosts Economy

Bobcat Company Donates $885,000 in Equipment to Support Salvation Army's Disaster Relief Efforts

VIDEO: KEMROC Expands; Plans to Increase Nationwide Presence

'Machinery Pete' Interviews Jack Lyon On RFD TV

VIDEO: Two Major Roadway Project Contracts Awarded by State Officials in West Virginia

VIDEO: First of Two Sections of NYC's $1.45B East Side Coastal Resiliency Project Is Complete

John Deere Construction Introduces Flexible Customer Training Options

INFRA Grant Moves Ohio's N. Coast Connector Project Steps Closer


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA