List Your Equipment For Free  /  Seller Login

Granite, Teichert Team Wins $275M Project in Sacramento

Tue July 02, 2019 - West Edition #14
Construction Equipment Guide


Granite announced that the joint venture team comprised of Granite and Teichert Inc. has been awarded a $275 million contract by the California Department of Transportation (Caltrans) for the SAC 5 Corridor Enhancement Project in Sacramento, Calif.

The project will rehabilitate 67 lane mi. of Interstate 5 beginning south of the Elk Grove Boulevard Overcrossing and extending to the American River Viaduct. Scope of work includes adding 23 mi. of High Occupancy Vehicle lanes; eight maintenance vehicle pullouts; two sound walls; replacement of a pedestrian overcrossing; and installation of fiber optic lines.

In addition, the team intends to recycle existing concrete pavement and other materials on site to reduce waste and cost as well as minimize truck haul trips.

Construction is scheduled to begin in fall 2019 and be completed by fall 2021.

For more information, visit dot.ca.gov/d3/projects/subprojects/0H10U/index.html and graniteconstruction.com.




Today's top stories

Iconic Hotel Being Demolished to Make Way for Baseball Stadium

MD 4 Project to Add Diamond Interchange

Volvo Construction Equipment Showcases New Products at North American Volvo Days

VIDEO: Anniversary of Highway Workers' Memorial Renews Calls for Work Zone Safety

Yanmar Compact Equipment Introduces New Line of Branded Attachments for Compact Track Loaders

Caterpillar Introduces Dynamic Energy Transfer Solution for Battery, Diesel-Electric Mining Equipment

Five Finalists Compete for Grand Prize Makeover in Bobcat Park and Rec Makeover Contest

VIDEO: Students From Washington, Ohio Earn Top Honors in Annual ARTBA Transportation Video Contest


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA