List Your Equipment For Free  /  Seller Login

Great Lakes Dredge and Dock Leads North End Beach Replenishment Work

Thu July 16, 2020 - National Edition #15
Ocean City, N.J.


Designed to rebuild beaches along this stretch, the more than $16 million project is part of a 50-year agreement that calls for a three-year cycle of renourishment projects.
Designed to rebuild beaches along this stretch, the more than $16 million project is part of a 50-year agreement that calls for a three-year cycle of renourishment projects.
Designed to rebuild beaches along this stretch, the more than $16 million project is part of a 50-year agreement that calls for a three-year cycle of renourishment projects. Great Lakes Dredge and Dock Company has been awarded the contract by the federal Army Corps of Engineers. A machine called a CRAB — a Coastal Research Amphibious Buggy — helps surveyors measure the beach where the water would be too deep for them to stand.

The Ocean City, N.J., beach is getting a facelift in the form of 1.5 million cu. yds. of new sand along 2.1 mi. of the area's northernmost and downtown beaches, between the terminal groin at Seaview Road and 13th Street.

Designed to rebuild beaches along this stretch, the more than $16 million project is part of a 50-year agreement that calls for a three-year cycle of renourishment projects of which the federal government pays 65 percent, the state 35 percent (with the municipality bearing 25 percent of the state's cost.)

Great Lakes Dredge and Dock Company has been awarded the contract by the federal Army Corps of Engineers.

Another replenishment occurred in 2017, with a $13.4 million project to rebuild beaches at the northern end of the island between Seaspray Road and the area beyond 12th Street. This work added about 1.3 million cu. yds. of sand to the beaches and stockpiled even more for the rebuilding of dunes in areas near Fifth Street and 10th Street.

In 2015, the beaches between the "terminal groin" — the northernmost jetty at Seaspray Road — to 12th Street were replenished as part of a $12.3 million project. The Army Corps of Engineers estimated the project would require nearly 1 million cu. yds. of sand, including approximately 40,000 cu. yds. to restore dunes.

The South End beach also has received replenishments in 2015, 2016 and 2020.




Today's top stories

Construction Market Boosts Economy

Bobcat Company Donates $885,000 in Equipment to Support Salvation Army's Disaster Relief Efforts

VIDEO: KEMROC Expands; Plans to Increase Nationwide Presence

'Machinery Pete' Interviews Jack Lyon On RFD TV

VIDEO: First of Two Sections of NYC's $1.45B East Side Coastal Resiliency Project Is Complete

John Deere Construction Introduces Flexible Customer Training Options

INFRA Grant Moves Ohio's N. Coast Connector Project Steps Closer

Ohio Gov. Announces Millions for Local Bridge Improvements


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA