Construction Equipment Guide
470 Maryland Drive
Fort Washington, PA 19034
800-523-2200
A motorgrader is a must in the road maintenance industry. With its long, flat blade called a moldboard, this piece of machinery creates a flat surface. This is the base course upon which the road surface is placed. Also known as a grader or road grader, it can also be used for other applications, such as: earthmoving, spreading and snow removal. They have three types of transmissions: hydrostatic, direct-drive, and torque-converter-drive. If you are in the market for a motorgrader, Construction Equipment Guide can help you find what you need. You can find new and used motor graders for sale from the leading equipment manufacturers right here.
G.W. Hall - Mon December 15, 2003
Contractors Tie Up Eight Interchanges Along I-20
By the end of the year, eight heavily-traveled interchanges on Interstate 20 east of Atlanta will be much safer. Contractors are expected to complete the majority of two major interchange reconstruction contracts for the Georgia Department of Transportation (GDOT) later this month....
Kerry Lynn Kirby - Wed November 26, 2003
SCDOT Brings I-77 in York County Up to Passing Grade
When the first phase of the Interstate 77 project in York County, SC, began two years ago, the traffic situation on the interstate was one step above deadlock, according to Phil Leazer, transportation manager for York County Engineering....
G.W. Hall - Fri October 03, 2003
Maybank Drawbridge Days Numbered as Crews Raise New Bridge Over Stono
The days when drawbridge openings meant traffic delays for motorists on Maybank Highway between James Island and Johns Island will soon become chapters in history books alongside others in Charleston’s rich and colorful history....
Gwenyth Laird Pernie - Tue August 05, 2003
Blythe Construction Speeds Up NC I-85 Widening Project
Design-build, a method of construction used by the ancient Greeks on buildings such as the Parthenon, is relatively new in American construction practices. Abandoned by modern architects and builders, the process is resurfacing in projects throughout the county. The design-build process is playing an important role in the widening of I-85 in North Carolina....
Brenda Ruggiero - Mon July 07, 2003
Oak Contracting Makes the Grade for $27.5M High School in Owings Mills, MD
By the start of the 2003 school year, high school students in the Owings Mills, MD, area will have a brand new school. Construction of the building is well under way under the direction of Oak Contracting Corporation, Baltimore....
G.W. Hall - Mon June 30, 2003
Contractors Complete Key Phase of 17th Street Bridge
Contractors involved in building Atlanta’s new 17th Street Bridge reached a major milestone recently when they set the last of the structure’s 48 steel beams in place. “The beam setting operations have been as smooth as we could have imagined,” said Mickey McGee, metro district construction engineer of the Georgia Department of Transportation (GDOT)....
Cindy Riley - Wed April 23, 2003
Crews Transform Birmingham Mall Into Vestavia Center
Developers with AIG Baker have recently transformed an outdated Birmingham, AL, mall into an open-air shopping center that includes a new theater, a Publix supermarket and space for numerous retail shops and restaurants....
Brenda Ruggiero - Thu October 24, 2002
Erie Becomes Transportation Mecca With New $8M Hub
An Intermodal Transportation Complex soon will open its doors for travelers in Erie, PA. Managed by the Erie-Western Pennsylvania Port Authority, the bayfront building will serve as a hub for passengers of Erie Metropolitan Transit Authority buses and eventually Greyhound buses....
G.W. Hall - Thu September 05, 2002
U.S. Group Transforms Highway 601
Travel between Orangeburg and St. Matthews, SC, will become faster and easier in 2003, when the South Carolina Department of Transportation (SCDOT) and U.S. Group Inc. complete a $15.1-million road widening project on U.S....
E. Lee Griggs - Wed July 10, 2002
Blythe, Army of Subs Ease Traffic Strain on SC’s I-385
Greenville, SC, is one of the fastest growing areas in state, and the I-385 connector from I-85 to downtown Greenville has become a traffic problem. According to the South Carolina Department of Transportation (SCDOT), I-385 currently averages 60,000 vehicles per day, and engineers project that number to increase to 92,000 by 2020....
See our Motor Graders specs.
Our equipment spec section contains Over 430,000+ specs for more than 18,000+ models, including Motor Graders.
Construction Equipment Guide
470 Maryland Drive
Fort Washington, PA 19034
800-523-2200
Construction Equipment Guide covers the nation with its four regional newspapers, offering construction and industry news and information along with new and used construction equipment for sale from dealers in your area. Now we extend those services and information to the internet. Making it as easy as possible to find the news and equipment that you need and want.
Contents Copyrighted 2024, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced (including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide’s unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication.
Read our privacy policy here.
Mastodon