List Your Equipment For Free  /  Seller Login

KLEMM KR 806-4GM Receives Its First European Assignment

Wed August 26, 2020 - National Edition
Klemm


In August, a KR 806-4GM was commissioned in cooperation with KLEMM's partner KMMB Demolición y Perforación (Madrid), and the very first assignment took place at a construction site inthe outskirts of the Basque industrial and port city of Bilbao.
In August, a KR 806-4GM was commissioned in cooperation with KLEMM's partner KMMB Demolición y Perforación (Madrid), and the very first assignment took place at a construction site inthe outskirts of the Basque industrial and port city of Bilbao.

With the purchase of its new anchor drilling rig, Tecimasa S.L.U., a Spanish Viuda de Sainz Group company and long-standing customer of KLEMM Bohrtechnik GmbH, relied once more on technology from KLEMM.

In August, a KR 806-4GM was commissioned in cooperation with KLEMM's partner KMMB Demolición y Perforación (Madrid), and the very first assignment took place at a construction site inthe outskirts of the Basque industrial and port city of Bilbao.

For the construction of a new building with an underground car park, anchor holes with a casing diameter of 5.9 in. (152 mm) and a drilling depth of 29.5 to 39 ft. (9 to 12 m) were drilled in an ambient temperature of more than 104F (40C).

The drilling rig, equipped with a manipulator and a revolving magazine (MAG 6.1) drilled the rods into the ground with a down-the-hole hammer. Since its launch at ConExpo earlier this year, multiple KR 806-4GM drilling rigs have excelled in various construction projects around the United States. This is the first assignment for the KR 806-4GM in the European market.




Today's top stories

Construction Market Boosts Economy

Bobcat Company Donates $885,000 in Equipment to Support Salvation Army's Disaster Relief Efforts

VIDEO: KEMROC Expands; Plans to Increase Nationwide Presence

'Machinery Pete' Interviews Jack Lyon On RFD TV

VIDEO: First of Two Sections of NYC's $1.45B East Side Coastal Resiliency Project Is Complete

John Deere Construction Introduces Flexible Customer Training Options

INFRA Grant Moves Ohio's N. Coast Connector Project Steps Closer

Ohio Gov. Announces Millions for Local Bridge Improvements


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA