List Your Equipment For Free  /  Seller Login

KPI Adds Optional Pre-Screen to FT4250 Mobile Impactor Plant

Wed November 13, 2019 - National Edition
KPI-JCI


By pre-screening the feed, users can maximize their scalping ability and minimize the amount of undersized material passing through the chamber, reducing wear costs and increasing the amount of final product by 30 percent.
By pre-screening the feed, users can maximize their scalping ability and minimize the amount of undersized material passing through the chamber, reducing wear costs and increasing the amount of final product by 30 percent.
By pre-screening the feed, users can maximize their scalping ability and minimize the amount of undersized material passing through the chamber, reducing wear costs and increasing the amount of final product by 30 percent.  The new option allows producers to scalp the feed, crush the material and post-screen all on one unit.

Kolberg-Pioneer has added a two-deck, 4 by 7 ft. pre-screen option to its FT4250 mobile impactor plant. The new option allows producers to scalp the feed, crush the material and post-screen all on one unit.

By pre-screening the feed, users can maximize their scalping ability and minimize the amount of undersized material passing through the chamber, reducing wear costs and increasing the amount of final product by 30 percent.

"Several of our customers are trying to produce products that have a significant amount of fines in the feed material. The pre-screen allows producers to remove those fines while also minimizing the amount of rejected in-spec product," Tim Harms, crushing and screening product manager at Kolberg-Pioneer, said.

For more information, call 605/668-2680 or visit www.kpijci.com.

This story also appears on Aggregate Equipment Guide.




Today's top stories

Construction Market Boosts Economy

Bobcat Company Donates $885,000 in Equipment to Support Salvation Army's Disaster Relief Efforts

VIDEO: KEMROC Expands; Plans to Increase Nationwide Presence

'Machinery Pete' Interviews Jack Lyon On RFD TV

VIDEO: First of Two Sections of NYC's $1.45B East Side Coastal Resiliency Project Is Complete

John Deere Construction Introduces Flexible Customer Training Options

INFRA Grant Moves Ohio's N. Coast Connector Project Steps Closer

Ohio Gov. Announces Millions for Local Bridge Improvements


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA