List Your Equipment For Free  /  Seller Login

LeeBoy 8520 Paver Provides Consistent Material Flow

Wed April 17, 2019 - National Edition #8
LeeBoy



 The LeeBoy 8520 paver features an ultra-efficient material management system for consistent flow from the truck to the screed.

The LeeBoy 8520 paver runs on a 106-hp Tier IV Final Kubota turbocharged diesel engine and has a 9-ton capacity hopper.

This paver features an ultra-efficient material management system for consistent flow from the truck to the screed. The dual 36-in. conveyors are wide and slow-moving to prevent segregation and reduce wear on components. Each conveyor, as well as the unit's under auger cutoffs, are independent. Weighing 3,260 lbs., the free-floating screed is electrically heated and has two hydraulic extensions. Paving width can be adjusted up to 15 ft. Two 12-in. hydraulic augers can be operated manually or automatically.

LeeBoy offers high-deck or low-deck configurations for the operator station, which also features Plus One dual electronic steering controls. The control panel can be shifted to the left or right side, according to the operator's choice.

Additional standard equipment includes a backup alarm, rotating safety beacon, LED work lights, vandalism protection covers and a gauge package that consists of oil pressure, hour meter, fuel gauge, volt meter, water temperature, tachometer, hydraulic-oil temperature, hydraulic level warning and engine diagnostics.

Remote screed control is available as an option, as is screed extension vibration and automatic screed heat temperature control.

Dimensions
  • Length: 14 ft. 5 in. (4.406 m)
  • Width: 8 ft. 6 in. (2.59 m) transport
  • 10 ft. (3.05 m) hopper wings down
  • Height: 8 ft. 2 in. (2.48 m)
  • Total Weight: 19,760 lbs. (8,962 kg)
Capacities
  • Fuel: 24 gal. (90 L)
  • Hydraulic reservoir: 73 gal. (276 L)
  • Washdown tank: 7 gal. (26.5 L)
  • DEF tank: 5 gal. (18.9 L)
Performance Features
  • 106 hp (79 kW) Kubota Tier IV Final diesel engine
  • Paving widths variable up to 15 ft. (4.5 m)
  • Choice of high-deck or low-deck configuration
  • Dual electronic steering
  • Sliding operator control station
  • Ultra-efficient material management system
  • Pressure ports for diagnostics and testing
  • 9-ton (8,164 kg) capacity material hopper
  • Proven heavy-duty legend screed, weight 3,260 lbs.
  • Electric screed heat, 12 kW generator
  • Heavy-duty undercarriage and track system

For more information, visit leeboy.com.

Here are specifications for other LeeBoy pavers, as well as the 8520:




Today's top stories

Construction Begins on Manhattan's $10B Midtown Bus Terminal Transformation

NDDOT, Partners Officially Kick Off Construction Season

MHTC Selects Radmacher-Ideker JV for MoDOT's Third Improve I-70 Project

Baltimore's Morgan State University Begins Construction on New $337M Science Center

Premier Installs Door System at Farm-Rite Equipment

Chairman Walberg Visits AED Member Buck & Knobby Equipment Company

BOMAG Americas Appoints Tom Schanz as Sales Director for Eastern Dealer Channel

Downtown Boston Construction Will Create New England's First Holocaust Museum


 







39.95234 \\ -75.16379 \\ Philadelphia \\ PA \\ US \\ 19019