List Your Equipment For Free  /  Seller Login

Link Belt Cranes Help Out With White House Renovations

Mon August 14, 2017 - National Edition
Construction Equipment Guide


Two Link Belt cranes were spotted in front of the White House this week as crews began construction work on both the interior and exterior.
Two Link Belt cranes were spotted in front of the White House this week as crews began construction work on both the interior and exterior.

The White House is currently in the midst of various renovations and updates as President Trump and his staff vacated the West Wing for 17 days.

Two Link-Belt cranes were spotted in front of the White House this week as crews began construction work on both the interior and exterior.

The list of projects, approved under President Obama, includes:

• Replacing the HVAC system

• Restoring the South Portico steps on the South Lawn (the last time they were restored, Eisenhower was President)

• Renovating the Navy mess kitchen

• Refurbishing the lower lobby

• Painting the interior

• Updating the IT system, and

• Replacing carpeting and curtains.




Today's top stories

Researchers Hope to Create Active Roles for All in Construction Safety Policy

Topanga Canyon Landslide Work Nears End in California

Heat Up Winter Productivity With Snow Removal Attachments for Your Compact Track Loader

Winter Equipment Launches New Product Catalog

Vermont Contractor Blends Old World Craftmanship With Modern Tech

Florida Governor Ron DeSantis to Speak at AED Summit

PA Turnpike Work Preps for the Future

American Concrete Pavement Association Announces New Board of Directors Chair


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA