List Your Equipment For Free  /  Seller Login

Metso Introduces Lokotrack CT3.2, CW3.2 Mobile Conveyors

Fri November 02, 2012 - National Edition
Construction Equipment Guide


Metso has launched the track mounted Lokotrack CT3.2 and wheel mounted Lokotrack CW3.2 mobile conveyors for the aggregate industry. These conveyors are specifically designed for applications that require high stockpile capacity and superior material transfer capabilities. They can handle sand, rock, gravel and other materials with equal efficiency, according to the manufacturer.

The self-propelled, tracked CT3.2 conveyor features a hydraulic drive system with variable speed control for regulating feed and maximizing fuel efficiency. The wheeled CW3.2 conveyor has a hydraulic coupled drive that can be operated from the crusher or screen without the need for an external power source.

Labor-saving features like centrally located remote greasing of head and foot bearing reduce maintenance costs. The conveyors offer enhanced handling mobility and can be repositioned while fully elevated. For extra versatility, options are available to increase efficiency and customize the conveyors to fit the application.

The CT3.2 and CW3.2 can be linked with other Lokotrack mobile crushing and screening plants. They add flexibility to multistage crushing and screening applications, enabling fast and easy closed-circuit operation of mobile units.

For more information, visit www.metso.com/miningnandconstruction.




Today's top stories

VIDEO: $4.7B Gordie Howe International Bridge Project Nears Completion

Volvo CE Upgrades Straight Boom Demolition Excavators

Construction Market Boosts Economy

Bobcat Company Donates $885,000 in Equipment to Support Salvation Army's Disaster Relief Efforts

VIDEO: KEMROC Expands; Plans to Increase Nationwide Presence

INFRA Grant Moves Ohio's N. Coast Connector Project Steps Closer

John Deere Construction Introduces Flexible Customer Training Options

VIDEO: First of Two Sections of NYC's $1.45B East Side Coastal Resiliency Project Is Complete


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA