List Your Equipment For Free  /  Seller Login

Minnich Introduces M-Box Vibration Control Solution

Mon January 29, 2018 - National Edition
Construction Equipment Guide


Minnich M-Box operators can select from speeds of 6,000, 8,000, and 10,800 VPM. The product converts the 230-volt, single-phase outlet of a 3,500-watt generator to 230-volt, three-phase output, allowing the operator to choose a uniform and compatible constant speed under different concrete loads.
Minnich M-Box operators can select from speeds of 6,000, 8,000, and 10,800 VPM. The product converts the 230-volt, single-phase outlet of a 3,500-watt generator to 230-volt, three-phase output, allowing the operator to choose a uniform and compatible constant speed under different concrete loads.

Minnich Manufacturing, a manufacturer of concrete dowel pin drills, concrete vibrators and vibrator monitoring systems, has introduced the M-Box vibration control solution.

The Minnich M-Box is an innovative control speed high-cycle power converter that enables high-cycle vibrator operators to control the speed/vibrations per minute (VPM) of up to two vibrators. The M-Box minimizes time and cost associated with patching structural concrete surface blemishes caused by excessive vibrator speeds.

In pumped concrete mixes, available/bleed water can be an issue. The faster the vibrator speed, the more water separation occurs and collects on the form faces. Chipping and patching labor and patch material can be expensive.

Minnich M-Box operators can select from speeds of 6,000, 8,000, and 10,800 VPM. The product converts the 230-volt, single-phase outlet of a 3,500-watt generator to 230-volt, three-phase output, allowing the operator to choose a uniform and compatible constant speed under different concrete loads.

"The M-Box gives our customers complete control of their concrete," said Rob Minnich, vice president of marketing at Minnich Manufacturing. "By helping operators apply the most force with the lowest speed, the M-Box maximizes vibration quality — and, in turn, the quality of the concrete structure."

For more information, call 419/903-0010 or visit minnich-mfg.com.




Today's top stories

Crews Orchestrate $41.3M Randy Owen Center for Performing Arts Project

January's Mental Wellness Month: Supporting Mental Health in Construction

How Machine Technology Supports Productivity, Safety

NAPA Ends 2024 On High Note

Texas A&M Board Approves More Than $500M for Construction

$33.2M Grant Announced for First Wildlife Crossing Over I-5

Largest Solar Power Facility in U.S. Gets OK in Oregon

VIDEO: Raleigh, N.C., to Try Again at Finding Contractor to Build Its First Bus Rapid Transit Line


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA