List Your Equipment For Free  /  Seller Login

State DOT: Board Advances $177M Bridge Replacement Project

Mon March 26, 2018 - National Edition
AASHTO Journal


Construction is expected to be completed by autumn 2023, MassDOT said.
Construction is expected to be completed by autumn 2023, MassDOT said.

The board of directors for the Massachusetts Department of Transportation approved a contract for about $177 million to replace Boston's North Washington Street Bridge that carries traffic over the Boston Inner Harbor between the North End and Charlestown.

MassDOT said some project activities, including utility work, are expected to begin this spring, with construction starting next autumn. That will require traffic lane reductions to allow crews to safely and effectively work on the structure, it said.

"This project is being carried out to improve the functionality of the bridge and ensure reliable travel throughout this area. This bridge is 118 years old and carries intercity vehicles as well as local MBTA bus, shuttle and tour bus routes," MassDOT said.

Construction is expected to be completed by autumn 2023, MassDOT said. "The full scope of work includes replacing the existing structurally deficient bridge, providing multimodal amenities including widened sidewalks, separated bicycle lanes and bus rapid transit lanes, increasing intersection safety and capability and improving the navigation channel," it said.

It also noted that "the bridge is safe for travel currently," but that due to its condition it requires between $1 million and $2 million in annual repairs.

"This bridge is an important link into the heart of Boston and we have been grateful to city of Boston officials, local leaders and key stakeholders as we have worked on the design for the new bridge," said Highway Administrator Jonathan Gulliver. "With this project, we will fully replace this city of Boston-owned bridge, improving the motor vehicle lanes – but just as importantly, improving the bridge to accommodate pedestrians, cyclists and mass transit users."

MassDOT said the existing bridge is also "a critical link in the MBTA bus network, providing passage for several Haymarket-destined bus routes from the north . . . MassDOT and the MBTA have been in close coordination and every effort is being made to minimize the travel time delays for these routes."




Today's top stories

Florida's Sarasota Bradenton International Airport Sees $105M Terminal Expansion

Louisville Pump Station Receives $230M Update

Rokbak Haul Track Telematics Boost Uptime With Proactive Maintenance

SISO Air, InTerra Form Strategic Reseller Agreement

Hitachi Construction Machinery Wins Silver in 2024 Anthem Award

Balfour Beatty's Carolinas Operations Selected for Over $36M in Special Project Works

Caterpillar to Spotlight 'Next 100 Years' at CES 2025

Liebherr to Exhibit at World of Concrete 2025


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA