List Your Equipment For Free  /  Seller Login

Steel Plant Partners With Cog Railway for Winter Work

Thu August 16, 2018 - Northeast Edition #17
The Associated Press


The Cog Railway is starting to redo the entire line from the base to the summit.
The Cog Railway is starting to redo the entire line from the base to the summit.

BERLIN, N.H. (AP) A 50,000-sq.-ft. steel plant has partnered with the Mount Washington Cog Railway to be used as a winter shop for maintenance and construction of locomotives and passenger coaches.

The Isaacson Steel fabrication plant in Berlin was acquired by David Presby at an auction several years ago. His brother, Wayne Presby, is president of the Cog Railway and was exploring the idea of replacing or expanding its workshops at the base of Mount Washington.

The Cog Railway is starting to redo the entire line from the base to the summit. Presby Steel will be making tie plates and supplying steel for a new work car with lights, heat, a crane, tools, welders and generators. Wayne Presby said work will now be done on the rail line all winter.




Today's top stories

Georgia Is Moving Ahead to Enhance Highway Networks

Iowa DOT's I-35 Project Includes New Bridges

Year in Review: Bobcat's Major Moments of 2024

Hiring, Retaining Construction Employees Starts With Attracting Right Candidates

MassDOT to Use Drones for Infrastructure Projects; Amherst Exploring New Downtown Designs

Eight I-15 Bridges Open in Idaho, Project Still Ongoing

Equipment Corporation of America Promotes Schell, Sigmund, McNeill

Hy-Brid Lifts Hires New VP of Sales, Marketing to Spearhead North American Sales Team, Bolster Customer Support


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA