List Your Equipment For Free  /  Seller Login

Steel Plant Partners With Cog Railway for Winter Work

Thu August 16, 2018 - Northeast Edition #17
The Associated Press


The Cog Railway is starting to redo the entire line from the base to the summit.
The Cog Railway is starting to redo the entire line from the base to the summit.

BERLIN, N.H. (AP) A 50,000-sq.-ft. steel plant has partnered with the Mount Washington Cog Railway to be used as a winter shop for maintenance and construction of locomotives and passenger coaches.

The Isaacson Steel fabrication plant in Berlin was acquired by David Presby at an auction several years ago. His brother, Wayne Presby, is president of the Cog Railway and was exploring the idea of replacing or expanding its workshops at the base of Mount Washington.

The Cog Railway is starting to redo the entire line from the base to the summit. Presby Steel will be making tie plates and supplying steel for a new work car with lights, heat, a crane, tools, welders and generators. Wayne Presby said work will now be done on the rail line all winter.




Today's top stories

Construction Market Boosts Economy

Bobcat Company Donates $885,000 in Equipment to Support Salvation Army's Disaster Relief Efforts

VIDEO: KEMROC Expands; Plans to Increase Nationwide Presence

'Machinery Pete' Interviews Jack Lyon On RFD TV

VIDEO: Two Major Roadway Project Contracts Awarded by State Officials in West Virginia

VIDEO: First of Two Sections of NYC's $1.45B East Side Coastal Resiliency Project Is Complete

John Deere Construction Introduces Flexible Customer Training Options

INFRA Grant Moves Ohio's N. Coast Connector Project Steps Closer


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA