Create a CEG Account  /  CEG Login

Tramac Announces the ’N-Series’ Breakers

Wed March 07, 2012 - National Edition
Construction Equipment Guide


Tramac has a new hydraulic breaker line called the “N-Series.”

“The N-Series breaker is designed and assembled by Montabert, renowned for their innovative engineering and quality standards. Combine that with Asian economies of scale, and we’ve got a really robust and well-priced hammer,” said John Sad, Tramac product manager. “While the N-Series doesn’t share all the features of Tramac’s V-Series, they do share the reliability, quality, and long-life that the Tramac name represents.”

The N Series is a nitrogen-fired breaker combining a shock system with blank-fire protection to provide powerful blows, reduced vibration and less wear on the internal components plus an optional breaker-mounted grease station.

“The market has asked for an entry level breaker with an eye on value that provides strong performance at a lower price without compromising on quality… and we delivered,” said Gregory Henry, Tramac’s general manager.

The N-Series breakers are currently offered in 2,000, 5,000 and 8,000 ft. lb. classes, for carriers from 10 to 37 tons (9 to 33.5 t). A 3,000 ft. lb. class will be launched this spring, with additional models to come. All are designed for heavy-duty use in breaking rock and concrete demolition. The N-Series breakers are identified with its charcoal gray color and N-Series logo. This also will visually differentiate the N-Series from the traditional Tramac “green or V-line”.

For more information, visit www.tramacbymontabert.com.




Today's top stories

PennDOT to Create High-Speed I-80 Corridor

USDOT Grows Construction Credit Assistance Program

Classen's Crane Service Expands Its Reach Across New England Region

Causeway Will Help Rebuild Helene-Damaged I-40 in N.C., Ingles to Replace Flooded Store

Atlas Copco Portable Air Compressor Chosen For Critical Bridge Deck Renewal

Takeuchi Introduces New TL11R3 Compact Track Loader

Georgia Starts $1.2B Upgrade to I-285/I-20 West Interchange in Fulton, Cobb Counties

New Ga. Tech Residence Hall Nears Topping Out, Ministry at UGA Developing New Building


 







39.95234 \\ -75.16379 \\ Philadelphia \\ PA \\ US \\ 19019