Create a CEG Account  /  CEG Login

UTA Awarded Grant for FrontRunner Training Simulator

Mon July 03, 2017 - West Edition #14
Construction Equipment Guide


UTA will receive $3.52 million to continue upgrading its Positive Train Control System or PTC. 
 The grant award also will be used to improve the communication system between FrontRunner trains and the signal houses to enhance the existing safety system.

The U.S. Department of Transportation's Federal Railroad Administration (FRA) and Federal Transit Administration (FTA) have announced that UTA will receive $3.52 million to continue upgrading its Positive Train Control System or PTC.

Part of these funds will be used to purchase a rail simulator so that operators can train and test on a computer like they do on the actual rail line. This will add yet another level of safety, as operators will now be better prepared before starting to operate on the system, and they will be able to continue training to improve their skills throughout their tenure as an operator.

“This grant will help complete the Positive Train Control safety upgrade for the UTA FrontRunner rail system that has been under design and construction for the past three years,” said Dave Goeres, chief safety and security officer. “We are on track to complete the safety improvement well ahead of the regulatory deadline of December 31, 2018.”

The grant award also will be used to improve the communication system between FrontRunner trains and the signal houses to enhance the existing safety system.

PTC systems are designed to prevent certain train-to-train collisions, over-speed derailments, incursions into established work zones and trains routed to the wrong tracks because a switch was left in the wrong position.

UTA's FrontRunner trains already have a speed control function that would prevent a train from traveling above the posted speed limit, which caused the accident involving the Amtrak train in 2015 outside of Philadelphia.




Today's top stories

PennDOT to Create High-Speed I-80 Corridor

USDOT Grows Construction Credit Assistance Program

Classen's Crane Service Expands Its Reach Across New England Region

Causeway Will Help Rebuild Helene-Damaged I-40 in N.C., Ingles to Replace Flooded Store

Atlas Copco Portable Air Compressor Chosen For Critical Bridge Deck Renewal

Takeuchi Introduces New TL11R3 Compact Track Loader

Georgia Starts $1.2B Upgrade to I-285/I-20 West Interchange in Fulton, Cobb Counties

New Ga. Tech Residence Hall Nears Topping Out, Ministry at UGA Developing New Building


 







39.95234 \\ -75.16379 \\ Philadelphia \\ PA \\ US \\ 19019