List Your Equipment For Free  /  Seller Login

VIDEO: State DOT Replaces Two Bridges in Four Days

Wed August 22, 2018 - Southeast Edition
Emily Buenzle



Watch as TDOT settles two bridges into place over Poplar Ave. in Memphis Aug. 17 to 20.

The Tennessee Department of Transportation (TDOT) recently replaced two bridges in Memphis.

The bridges, which sat over Poplar Ave. at I-240, were built more than 60 years ago. Through TDOT's $54 million project, known as MemFix 4, both were recently replaced, the Memphis Business Journal reported. In June, part of I-240 was closed to on weekends, which allowed crews to perform the necessary work.

In the time lapse video above, you can see as the new bridges are settled into place between Aug. 17 and 20.




Today's top stories

Iowa DOT's I-35 Project Includes New Bridges

Hiring, Retaining Construction Employees Starts With Attracting Right Candidates

Eight I-15 Bridges Open in Idaho, Project Still Ongoing

Next Generation Cat D8 Dozer Provides Next-Level Technology

BPC, Fay Lead Part of $1.5B PennDOT Project

CNH Designs Special Edition Case Compact Track Loader Inspired by Metallica Frontman James Hetfield

VIDEO: DEVELON DX225LC-7X Crawler Excavator Offers Fully Electrohydraulic Control System

Hy-Brid Lifts Hires New VP of Sales, Marketing to Spearhead North American Sales Team, Bolster Customer Support


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA