List Your Equipment For Free  /  Seller Login

Work to Begin on Toll Road Linking WV to Pittsburgh

Fri July 11, 2003 - Northeast Edition
Construction Equipment Guide


UNIONTOWN, PA (AP) Turnpike officials have designated a 15-mi. gap in Fayette County, PA, as the next section where work will continue on a long-sought toll road linking West Virginia and Pittsburgh, a state lawmaker said.

Pennsylvania state Sen. Richard Kasunic said officials with the Pennsylvania Turnpike Commission told him the section between Uniontown and Brownsville is the next slated for construction as part of the 100-mi. (150.9 km) long Mon Fayette Expressway.

The section would fill a gap in the two existing sections of the expressway – an 8-mi. (12.4 km) section from Fairchance to Uniontown and a 17-mi. (23.4 km) section from Brownsville to Interstate 70.

Kenneth Slippey, the turnpike’s manager for the expressway, said work could begin as soon as 2005 if the commission has the needed $360 million.

In eight years or so, the expressway could finally be complete from Interstate 68 in West Virginia more than 70 miles to Pittsburgh. Officials hope that will open up some of the most depressed areas of Pennsylvania to new business and relieve traffic.




Today's top stories

Researchers Hope to Create Active Roles for All in Construction Safety Policy

Topanga Canyon Landslide Work Nears End in California

Heat Up Winter Productivity With Snow Removal Attachments for Your Compact Track Loader

Winter Equipment Launches New Product Catalog

Vermont Contractor Blends Old World Craftmanship With Modern Tech

Florida Governor Ron DeSantis to Speak at AED Summit

PA Turnpike Work Preps for the Future

American Concrete Pavement Association Announces New Board of Directors Chair


 







39.95234 \\ -75.16379 \\ Fort Washington \\ PA